Skip to content
Ryan's ExtremeContracting
Example image, not one of our jobs: an open living room and kitchen in a Colorado Springs home with new oak vinyl plank flooring, a white subway tile backsplash, and pines and foothills through the window
Example image

Ryan's Extreme Contracting

Tile and LVP Flooring Installation in Colorado Springs, CO

Tile floors, tub and shower walls, backsplashes and luxury vinyl plank. Free estimates from Ryan, the owner. Pueblo too.

For homes built in 1978 or later. Why?

Tile or LVP?

Where Each One Makes Sense

Plenty of homes end up with both: tile where water sits, plank where you want warmth and the look of wood. Ryan installs both, so he'll tell you which fits each room.

Tile is the pick for

  • Shower walls and tub surrounds
  • Bathroom floors that see splashing every day
  • Entries where snow and gravel come in on boots
  • Kitchen backsplashes
Tile floors
Example image, not one of our jobs: a doorway where a new grey tile bathroom floor meets new oak vinyl plank in the hallway, joined by a low metal transition stripExample

Tile in the bathroom, plank in the hall, one strip between them.

LVP is the pick for

  • Basements on a concrete slab
  • Bedrooms and living rooms where you want the look of wood
  • Whole floors that run room to room without a break
  • Kitchens where you want something softer underfoot than tile
LVP flooring
Example image, not one of our jobs: a bathroom floor with cement backer board screwed down and taped, the toilet removed, a trowel, a bucket of thinset and a stack of new tileExample
Backer board down before tile

Before anything goes down

The Floor Under the Floor

Most cracked tile and gapping plank comes from what's underneath. Here's what gets checked first.

Flat
Tile cracks and plank joints pop on a wavy floor. High spots get sanded and low spots filled.
Stiff
A bouncy wood subfloor breaks grout. Under tile, cement backer board goes down first.
Dry
Basement slabs get checked for moisture before plank goes over them.
Settled
In dry Colorado air, plank boxes sit in the house before they're laid.

Before you call

Is your home a fit?

Built in 1978 or later

Homes built before 1978 may have lead paint on the baseboards, trim and walls, and federal EPA rules say only a lead-safe certified firm can disturb it. Tile and floor jobs take that trim off, so we take on homes built in 1978 or later.

Colorado Springs, Security-Widefield, Fountain and Pueblo

In Pueblo we work inside city limits. Pueblo West, Colorado City and other county addresses aren't on our list yet. Pueblo details

Not taken on

  • Homes built before 1978 (EPA lead rules)
  • Plumbing changes: valves, drains, pipes, shower pans
  • Electrical work, including heated-floor wiring
  • Joist, framing or other structural repairs
  • Pueblo West, Colorado City and other Pueblo County addresses outside city limits
  • Commercial buildings

Who you'll deal with

One Owner, Start to Finish

When you call or text (719) 922-7131, you reach Ryan. He looks at the room, tells you what the floor or walls need, gives you the price and does the install. Ryan says he has been doing this work for more than 25 years. Ryan says he can give you references on request.

In his own words

“quality work Reasonably priced locally owned owner operated”
Ryan, in his posts on Facebook and Nextdoor, quoted word for word. There are no customer reviews on this site yet; ask Ryan for references.

How a job goes

From the First Text to the Last Row

  1. 1

    Call or text Ryan

    Tell him the room, what's there now and what you'd like. Photos help.

  2. 2

    Free estimate

    Ryan looks at the room and the floor or walls under it, and gives you a price.

  3. 3

    Pick your tile or plank

    Choose the material and set a start date.

  4. 4

    Prep, then install

    Old floor out, the surface made flat and solid, then the tile or plank.

  5. 5

    Walk it together

    You look it over with Ryan before he packs up.

Example image, not one of our jobs: a bedroom with warm oak vinyl plank half laid over the subfloor, spacers along the wall, a mallet and tapping block nearbyExample

Where we work

Colorado Springs to Pueblo

Based in Colorado Springs. Nearby and not on the list? Call or text and ask.

Questions

Tile and Flooring Questions

Do tile installers need a license in Colorado Springs?

Not for tile and floor coverings. The Pikes Peak Regional Building Code lists tiling, carpeting and similar finish work as work that doesn't need a permit (RBC105.2.1, item 11), and a contractor license is only required for work that needs a permit (RBC201.3). In the City of Pueblo, the Southern Colorado Building Department lists flooring and tile work as exceptions to its licensing. Work that does need a permit, like plumbing or electrical, is not something we take on.

Why only homes built in 1978 or later?

Homes built before 1978 may have lead paint on the baseboards, trim and walls, and federal EPA rules say only a lead-safe certified firm can disturb it. Tile and floor jobs take that trim off, so we take on homes built in 1978 or later.

How do I find out what year my house was built?

It's on the El Paso County or Pueblo County Assessor's record for your address, and often on your closing papers.

Tile or LVP for a basement?

On a concrete slab, LVP is the usual pick: it floats over the concrete, feels warmer and isn't hurt by water. Tile works too if the slab is flat and has no cracks that move. Ryan will look at the slab and tell you.

Do you work in Pueblo?

In Pueblo we work inside city limits. Pueblo West, Colorado City and other county addresses aren't on our list yet.

Is the estimate free?

Yes. Call or text Ryan and he'll set a time to look at the job and give you a price.

Ready for a price on your tile or floor?

The estimate is free, and you deal with Ryan, the owner. Call or text, and send a few photos of the room if you have them.

For homes built in 1978 or later. Why?

Example